Navigara · Product·Alignment

Align engineering work to
business outcomes.

Alignment ranks every objective by the performance it actually received, month by month and repo by repo, then flags the ones running past their target date. It is the honest answer to the question every leadership meeting eventually asks: “Are we actually on track?”

Start free trial
Insights / Objectives

Objectives

How your work aligns to strategic objectives over time · all contributors · 12 months.

Alignment
49%
447.8 ETV aligned · 466.9 ETV unplanned
Total performance
914.7 ETV
grow + maintenance + fixes
At risk
3
overdue, or target within 14 days
Work mix
59 / 25 / 16%
grow / maintenance / fixes (aligned work)
Objective alignment
How performance aligns to objectives over time, ranked by output.
Objective alignment over 12 months20 ETV40 ETV60 ETVSepNovJanMarMayJul
  • Checkout redesign
  • Enterprise SSO
  • Self-serve onboarding
  • Cut p99 latency
  • SOC 2 Type II
  • Search relevance
  • Other (13)
ObjectiveStatusSharePerformance
Checkout redesignActive32%144.0ETV
Enterprise SSOStarted20%88.0ETV
Self-serve onboardingActive16%72.0ETV
Cut p99 latencyCompleted14%64.0ETV
SOC 2 Type IIActive10%44.0ETV
Search relevanceActive0%1.4ETV
Other (13)Active8%34.4ETV
1–7 of 19Ranked by performance
01The pipeline

From commits to priorities, with no self-reports in between.

Navigara reads every commit, classifies the intent, and tags the priority it actually moved. Then it cross-checks the issue tracker to surface what shipped without ever being tracked.

The signal you walk into the boardroom with comes directly from the repo. Nothing passed through a standup claim on the way there.

Your code never leaves your servers. We measure outcomes, not activity.

02Delivery risk

Which objectives are about to miss.

Every objective carries a status and a target date. Navigara groups them by delivery risk, so the ones about to slip surface while there is still time to move people. Completed objectives drop out of the view. An objective sitting at almost no performance is flagged too, because a named objective nobody is building is the failure nobody reports.

Initiative health

Grouped by delivery risk from status and target date. Completed objectives are hidden.

Overdue2
  • Checkout redesign144.0ETVTarget Jul 31, 2026
  • Search relevance1.4ETVTarget Jun 26, 2026
At risk1
  • Enterprise SSO88.0ETVTarget Aug 21, 2026
On track3
  • Self-serve onboarding72.0ETVTarget Sep 30, 2026
  • SOC 2 Type II44.0ETVTarget Aug 31, 2026
  • Other (13)34.4ETVNo target date
03Bottom-up · Feature view

Pick a feature. See what kind of work it actually cost.

Features cost time, and every engineering leader knows this. What most have never seen is what kind of time: growth, maintenance, or fixes, and how that split has changed quarter over quarter without anyone calling it out.

Drag the slider through history and watch the shape change. The first time you run this on a live feature, you will see something you suspected and could not prove until now.

  • Growth, maintenance, and fixes per feature
  • Retroactive across the feature's full history
  • Compare features against each other and against the org average
  • Surface features quietly bleeding the team
alignment / featuresCheckout redesign
Q1 2026 to dateWhere the performance went
12 weeks · 4 teams
62%
28%
10%
  • Growthnew capabilities, surfaces, integrations62%+8pp
  • Maintenancerefactors, dependency upgrades, infra28%-5pp
  • Fixesbugs, regressions, edge cases10%-3pp

vs. Q4 2025 baseline · click any row to see contributing PRs

alignment / retro8 quarters
Checkout redesigndrag through history
Q2'24
Q3'24
Q4'24
Q1'25
Q2'25
Q3'25
Q4'25
Q1'26
Q2 2025
Growth28%Maintenance55%Fixes17%
04What this changes

What you can walk into a room and say on Monday.

  • Walk in with the performance each objective actually received, not the share estimated in the planning doc
  • Tell the CEO which objectives got the output and which got almost none, and back it with the PRs behind every number
  • Name the three initiatives that will miss their target date, while there is still time to move people
  • Show how much of the quarter was maintenance and fixes rather than growth, per objective
  • Run a quarterly retro on what shipped, not on how people felt about what shipped
Get started

Run alignment
on your data.

Connect your repos. Name your objectives. Navigara measures who shipped what against them, month by month, and flags what is about to miss.

If the numbers surprise you, we should talk.

Start free trial